PERI GmbH, Products - ACS R Self Climbing System

ACS R Self Climbing System

ACS R Self Climbing System ACS R Self Climbing System ACS R Self Climbing System More images  

The proven principle of the triangular bracket as the solution for all standard applications.

The PERI self-climbing system ACS R (R = regular) is used everywhere where large areas have to be formed, and where the walls have to be fully accessible from above. Pre-assembled reinforcement cages can thereby be entered unhindered from above. Large bracket spacings reduce the need of anchors and ultimately minimize the number of anchor positions in the wall. A lot of space remains for fixtures as well as window and door box-outs.
The working platforms are very wide and generously designed. A retracting distance of 80 cm makes working with the formwork considerably easier.

Advantages
  • Crane-independent
    Crane-independent forming, striking and climbing speeds up the work procedures on the construction site and also makes them independent of each other. This means the planned sequences can be maintained along with guaranteeing high productivity levels. The crane can therefore be used for other tasks.
  • Climbing in all weathers
    The PERI ACS can be climbed during all conditions which means that weather-related delays in the construction progress are avoided. In order to provide protection against the weather, the working platforms can be enclosed. The comfortably designed platforms allow safe and efficient working routines as on the ground.
  • High bearing capacity and safe
    The stable working platforms are able to carry large loads, e.g. the storage of reinforcing steel for the next climbing section. Generously-sized working platforms, the well thought-out design for handling very high wind loads and the patented control function of the climbing mechanism are some of the special details contained within the comprehensive safety concept.
  • Preparation of large areas for reinforcement possible
    The walls are fully accessible from above. Pre-assembled reinforcement cages can thereby be entered unhindered from above.
  • Projekt
  • New Tomei Expressway: Aokigawa Bridge
  • Hitachi Elevator Test Tower