MAXIMO Panel Formwork
MAXIMO Tie Technology
Faster forming with a minimum of site personnel using the one-sided MX Tie Technology

Faster
through ties inserted from one side only with MX tie technology without spacer tubes

Time-saving
through reduced and systematised tie points

Enhanced concrete finish
through a neat joint and tie arrangement